Mobile concrete batching plant to do the basis of the precautions

2017-04-11

Mobile concrete batching plant is often used in large-scale concrete project, long construction period, the site of large-scale projects, because the mobile concrete batching plant is a combination of concrete mixing device, so the layout of the site is particularly important, the need for reasonable and scientific system between the assembly, If the installation site is limited, this will lead to the mobile concrete batching plant can not be reasonable to complete the system assembly, but also consider the operation of concrete mixing plant transport materials and finished material transport is convenient, only a reasonable layout of the site in order to ensure the progress of the project. So, what is the need to pay attention to when the concrete mixing plant is based

1, mobile concrete batching plant according to the construction site of the actual situation for more flexible layout. But before installation, the site should be flat and intact, and according to the release of the large sample location (large sample should be retained until the equipment is installed), the pre-made the basis of the support of the components, the mixture of storage and powder The concrete piers of the material supply system should retain the secondary grouting hole of the anchor bolts.

2. The installation foundation of the equipment should be selected in the open area in order to shorten the loading cycle of the loader. At the same time, but also to ensure that the finished material transport vehicles U-turn convenient, smooth and non-interference.

3, prefabricated foundation, to ensure its smoothness and size requirements, so that the equipment installed firmly, lap reasonable. Because the quality of the foundation will affect the normal work of equipment and the use of quality.

4, in order to facilitate the loader feeding, in the ingredients on the feeding side of the material should be set on the slope of the pier, and the ingredients between the units should be kept a free access to the inspection channel, in order to facilitate the operation of equipment and inspection, maintenance and maintenance. At the same time, in the loading slope between the piers and the dosing unit should be set up protective fence, in order to avoid the loader when the material stored on the accumulation of concrete mixing plant aggregate conveyor belt adversely affected the normal operation.