How to control the cleaning time of HZN concrete mixing plant

2017-05-10

HZN concrete mixing plant equipment mixing host cleaning work is an essential part of the maintenance of the whole station equipment, the choice of cleaning time and control is also a certain law to follow, then how to control the HZN concrete mixing plant cleaning time?

The mixing station should be cleaned at least once during one duty cycle. After the end of daily production, the mixing station should be a comprehensive cleaning machine. Cleaning process, the water and a little stone into the mixing console stirring 5 ~ 10 min, after cleaning the machine will be all the material removed, no water, accumulation; stop and then flush the pipe, remove the mixing tank inside and outside the dust and Adhesive concrete. Under normal circumstances, JS1000 mixing host water about 150 ~ 180 kg or so, other models can be added or subtracted accordingly, but also self-contained high-pressure water gun to clean up.

In the washing and stirring the host material door, should avoid the upper part of the accumulation of foreign matter under the material stuck material phenomenon. During the mixing process, if the concrete truck is not in place for a long time (more than 20 to 30 min, especially in the summer), the mixer should be cleaned with water.

In the HZN concrete mixing plant to stir the host for cleaning, the need to pay attention to the following:
1, HZN concrete mixing plant equipment during normal production, to regularly check the mixing cylinder and the mixing shaft on the solidification of the concrete, if the condensation should be promptly required to manually eradicate. Manual cleaning stirrer, you must cut off the power supply, gas, put the remaining gas, lock the control room; manual cleaning mixer, is strictly prohibited violent knock on the stirring shaft, stirring arm and stirring blades.

2, the HZN concrete mixing plant equipment in the washing and stirring the host material door, should avoid the upper part of the accumulation of foreign material under the material stuck material phenomenon. During the mixing process, if the concrete truck is not in place for a long time (more than 20 to 30 min, especially in the summer), the mixer should be cleaned with water.