What factors are needed to build a mobile concrete mixing plant

2017-06-23

Mobile concrete mixing plant before the station need a professional acquisition staff to carry out the understanding of the plan, a reasonable selection will reduce the unnecessary cost of waste, the top 100 mechanical summary of the mobile concrete mixing plant before the station needs the necessary five elements are as follows:

1. The type of selection should be appropriate; generally by the technical department based on the amount of internship in advance to estimate the amount of concrete required for use, and then match the appropriate concrete mixer, batching machine and other corresponding types to meet customer needs. In the selection of materials also need to consider the delivery of concrete. Such as: is the direct pumping is still the vehicle delivery. The volume of the vehicle is also an important basis for determining the type of mixing station.

2. Construction environment and construction policy; in the selection of the acquisition of mobile concrete mixing plant, should be fully aware of the construction policy and the impact of the construction environment, and then ensure the smooth construction and construction quality. When the site to be a one-time pouring a large amount (according to the optional stirring to be stirred for more than 12 hours), enough quality and high demand, and there is no aid near the mixing station, the best selection of two standard small mixing station , Perhaps the selection of a main pair of double machine manufacturing. When the site is inconvenient, the staff will be able to spend a lot of time on the site, the best choice with the same small standard double station, or ready to spare parts, and then ensure the smooth progress of construction. When the construction site is loose, but the distance between the site is not too far, the transport radius of concrete transport vehicles do not cross half an hour by car, dump truck delivery does not exceed 10 minutes by car. The best choice of multi-number meet together to stir the utilization of the mixing station and the construction of economic benefits.

3. The quality of the operator; In general, the structure of a small mixing station is relatively simple, the control system is also more simple, the operation of the repair staff asked lower. While the larger station structure messy, high degree of automation, and thus the requirements of the operator is also higher.

4. Manufacturers selected; in general, manufacturers have old goods manufacturing, such as standards, quantity, type and so on. You can make your special request when ordering. Manufacturers will be very satisfied with your request. But in the purchase of goods should not be tedious, it will constitute an economic unnecessary damage. Also in addition to the purchase of goods in addition to reference to the manufacturer s offer, but also should pay special attention to the manufacturer s list of different manufacturers.